Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Evaluation Criteria

(Note: video content was created during the general location study in 2017)

The Triple Bottom Line Method was used to rank options in a series of weighted evaluation criteria in three key areas: Environmental; Social; Economic.

Environmental Criteria

  • Impact on the natural environment (air, water, land and wildlife) – Infrastructure projects of this size can have a significant impact on the natural environment. Typical impacts include disruption of natural water drainage, reduction of air quality, and reduction of productive agricultural land.
  • Minimize impacts to agricultural land use – The land surrounding the project is on Saskatoon's rural/urban edge. A significant amount of farmland is included in the study area and there was a desire to minimize impacts on agricultural land. No consideration was given to the different types of farmland (cultivated land vs. land used for grazing) or ownership (private farmland vs. university land).

Social Criteria

  • Impact on adjacent landowners: The degree to which the corridor impacts the standard of living of adjacent landowners was assessed based on the number of impacted landowners. Densely developed areas were given more consideration than individual landowners. Impacts to commercial development were also considered.
  • Access: The Saskatoon Freeway will ultimately be a free-flow facility, with no at-grade access to surrounding property. However, surrounding property must have some form of access. This criterion is intended to capture the ability of each alternative to provide access from the freeway to property in the vicinity of each interchange via the crossing roadway.
  • Geometric compliance and safety: Certain safety and design standards must be addressed by the alignment options under consideration. Design criteria considered items such as location and spacing of future overpasses and intersection angles. Safety was assessed by comparing the number of conflict points on each alignment, as well as the relative complexity of the overpasses.

Economic Criteria

  • Lifecycle cost comparison capital & operational cost: In general terms, the route with the lowest lifecycle cost was given the highest score. Lifecycle cost consists of overall capital cost and operating and maintenance cost.
  • Facilitate and promote future regional economic growth and development: Each route option has different degrees of impact on these activities: travel time, directness, ease of access and other considerations. The City of Saskatoon and the RM of Corman Park have based future development plans on the previous alignment for the Saskatoon Freeway in the southeast area. Therefore, options with the least difference from the previous alignment received the most merit under this evaluation.
  • Efficient and effective bypass/truck route: The south route of the Saskatoon Freeway will serve as the main link between highways on the National Highway System – Highways 7, 11 and 16 – as well as a bypass around the city for public and commercial traffic. Travel times for traffic with origins and destinations outside of the city using the proposed freeway were assessed in the evaluation.
  • Optimize existing and future regional road network: The freeway will provide an alternate route for commuters, especially for communities southeast and west of the city. This included how well the Saskatoon Freeway fits within the regional road network and contributes to the efficiency of travel routes.