Government of Saskatchewan ministries, Crown corporations and organizations are working to minimize the impacts of the postal service disruption.

Les ministères, les sociétés d’État et les organismes du gouvernement de la Saskatchewan travaillent à réduire au minimum les répercussions de l’interruption des services postaux.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

ICE ROAD CONSTRUCTION UNDERWAY IN FAR NORTH

Released on February 8, 2007

Construction is underway on ice roads used to supply remote communities without land access in the far north.

“The recent cold weather in northern Saskatchewan has allowed the ice over Wollaston Lake and Lake Athabasca to thicken to the point that the ice roads could be built,” Highways and Transportation Minister Eldon Lautermilch said.  “This is great news for the northern communities that rely on these roads to transport goods into the community.  The alternative, which is to fly the goods into northern airports, means considerable cost being added to the goods that families need.”

Construction has been completed on the Wollaston Lake ice road, which is 46 km long and connects Highway 905 (about 22 km south of the Rabbit Lake Mine) to the community of Wollaston Lake.  The contractor, Hatchet Lake Denesuline First Nation Economic Development Corporation, began construction on January 29 at the community of Wollaston.  The road opened February 2 to light vehicle traffic.

The Athabasca seasonal road and related ice roads, under contract to the Athabasca Basin Development Corporation, are constructed in four sections for a total length of 358 km.

The first section is a 183 km bladed trail over land, from Points North to Black Lake, operated as a winter road only.  This road is open with good winter driving on most of the road, with the exception of rough sections on the south end and ice and water across the road at kilometre 21.

The second section from Stony Rapids to Shasko Bay is constructed over land and frozen muskeg for a total of 50 km.  The contractor began work on January 21 dragging and packing the road for travel, with an estimated completion by the end of the week.
 
The third section is 30 km over ice from Shasko Bay to Fond du Lac.  Construction has begun on the Fond du Lac end with about 9 kms completed.  This road is anticipated to be open by the end of the week.  Construction will begin on the fourth section – 93 km from Fond du Lac to Uranium City – once the third section is complete.

In the past 10 years, both the Wollaston Lake and Lake Athabasca ice roads have on average opened around mid-February.

“We are pleased that the ice roads could be built this year within a normal time frame to bring needed supplies to these communities,” Lautermilch said.  “However, we know year-round land access is required to provide remote northern communities with better access to economic development opportunities, employment, healthcare, education and more.  We are committed to this goal.”

The Province will provide $65.5 million to build new roads and improve existing ones in Northern Saskatchewan under Roads to Prosperity – the Northern Economic Infrastructure Strategy announced in the fall of 2006.  This includes constructing a 110 km all-weather road from Wollaston Lake to Highway 905, upgrading the Athabasca seasonal road from Points North to Black Lake to an all-weather surface, and constructing an 88 km all-weather road from Stony Rapids to the south shore of Fond du Lac.

-30-

For more information, contact:

Dan Palmer
Highways and Transportation
Regina
Phone: 306-787-4805
Email: DPalmer@highways.gov.sk.ca 

We need your feedback to improve saskatchewan.ca. Help us improve