Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

New Passing Lanes Being Built on Highway 5

Released on July 6, 2017

Two Sets West of Humboldt

Construction of new passing lanes is underway on Highway 5 near Humboldt.

”As the province grows, traffic is increasing on our busiest highways, which serve as key export routes,” Highways and Infrastructure Minister David Marit said.  “Under the Saskatchewan Plan for Growth, we are committed to investments like twinning and passing lanes that increase capacity, enhance traffic flow and improve safety.”

There will be two sets of passing lanes (four in total) for about 20 kilometres west of Humboldt to the junction of Highway 2.

Passing lanes were opened on Highway 10 between Balgonie and Fort Qu’Appelle in 2013 and on Highway 7 between Rosetown and Delisle in 2015.  Studies have shown passing lanes can reduce collisions by as much as 25 per cent at 15 per cent of the cost of full twinning.

Construction on the two sets of passing lanes for about 20 kilometres between Humboldt and the Highway 2 junction started in late June.  The $7.6 million project is scheduled to be complete this fall. 

Motorists should anticipate delays and plan ahead by checking in with the Highway Hotline at www.saskatchewan.ca/highwayhotline.  The weekly construction update is published on www.saskatchewan.ca/residents/transportation/highway-construction-projects/weekly-highway-construction-update throughout the spring and summer months to provide the travelling public with the latest construction information.

The Government of Saskatchewan has invested $7.4 billion in transportation infrastructure since 2008, improving more than 12,000 km of Saskatchewan highways.

-30-

For more information, contact:

Steve Shaheen
Highways and Infrastructure
Regina 
Phone: 306-527-8740
Email: steve.shaheen@gov.sk.ca

We need your feedback to improve saskatchewan.ca. Help us improve