Government of Saskatchewan ministries, Crown corporations and organizations are working to minimize the impacts of the postal service disruption.

Les ministères, les sociétés d’État et les organismes du gouvernement de la Saskatchewan travaillent à réduire au minimum les répercussions de l’interruption des services postaux.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Resurfacing complete on Highway 11 north of Dundurn

Released on August 29, 2003

Resurfacing is now complete on a 10.2 km section of Highway 11 north of Dundurn.

"This resurfacing is part of our commitment to building better highways," said Highways and Transportation Minister Mark Wartman. "Highway 11 has seen an increase in truck traffic, leading to wear and tear on the highway surface. It also serves as an important tourism link and trade corridor between our province's two largest cities, Regina and Saskatoon. The completed construction has helped revitalize Highway 11."

The $920,000 improvement project on Highway 11 took place on the northbound driving lanes, beginning 8 km north of the main Dundurn Access to 18 km north of Dundurn.

Earlier this summer, a 25.6 km section of Highway 11 between Craik and Davidson and a 9 km section south and north of Craik was also resurfaced.

"In Saskatchewan, highways are a lifeline – connecting us to one another and driving economic development," Wartman said. "The completed improvements to Highway 11 demonstrate once again that transportation is a priority for the Government of Saskatchewan as we build towards our wide open future."

The government has committed $296.2 million to building better highways in 2003-2004. More than 700 km of highways will be reconstructed and paved this year.

Motorists are reminded to reduce speed and drive safely through the Orange Zone and to also watch for construction signs and heavy equipment during this season of heavy road construction.

For more information about road construction projects, and other Saskatchewan Highways and Transportation activities, visit the web site at: www.highways.gov.sk.ca.

-30-



For More Information, Contact:

Doug Wakabayashi
Highways and Transportation
Regina
Phone: (306)787-4805

We need your feedback to improve saskatchewan.ca. Help us improve