Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

HIGHWAY 2 REHAB INCLUDES CULVERT INSTALLATIONS, REPAVING

Released on October 3, 2013

Repaving and culvert installations are among more than $6 million in repairs underway on a damaged stretch of Highway 2 north of Prince Albert.
 
Higher than average spring runoff and heavy rains saw the affected area closed to light traffic for more than a month this summer as water flowed over the highway.  Heavy truck traffic continued to pass through the area during the flood.

“Now that the flood water has subsided, we will be able to fully repair and strengthen this important passageway to the north,” Highways and Infrastructure Minister Don McMorris said.  “The new culverts will help to ensure water flows safely under the road, while the new pavement will provide a strong, smooth driving surface.”

The repairs include about 14 km of repaving from just north of the junction of Highway 2 and Highway 355 to the south, as well as culvert installations.  An extra layer of pavement will also be added to restore strength in the flood-affected area.

Motorists should be prepared to slow to 60 km/hr through the work zone.  Traffic will be reduced to one lane at times during construction.

To learn more about Saskatchewan work zones, head to www.highways.gov.sk.ca/workzone/ and to view a gallery of photos from this year’s construction season, visit www.highways.gov.sk.ca//ConstructionGallery2013.

Additional travel information about emergency road closures, the status of ferries and barges and other road activities can also be found on the Highway Hotline at www.highways.gov.sk.ca/road-conditions.  It's also available by calling 306-787-7623 in Regina, 306-933-8333 in Saskatoon, the SaskTel cellular network at *ROAD, toll-free across Canada at 1-888-335-7623 and via the Highway Hotline mobile website at http://hotline.gov.sk.ca/sk/map/mobile/.

The government has invested a record $3.7 billion in transportation infrastructure since 2008.

-30-

For more information, contact:

Joel Cherry
Highways and Infrastructure
Regina
Phone: 306-787-4805

We need your feedback to improve saskatchewan.ca. Help us improve