Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

CIRCLE DRIVE SOUTH PROJECT TO OFFICIALLY OPEN TO TRAFFIC

Released on July 31, 2013

Officials from the federal, provincial, and municipal governments today led a Bridge Parade across the new Circle Drive South Bridge to ceremonially open Saskatoon’s largest infrastructure project.  The roadway will officially open tonight, which includes the bridge and 10 kilometres of new roadways as part of the Circle Drive South Project.

Participating in the ceremony were Canada’s Minister of International Trade and Minister for the Asia-Pacific Gateway Ed Fast, Minister of State (Foreign Affairs and Consular) Lynne Yelich, Saskatchewan’s Minister of Highways and Infrastructure Don McMorris and Saskatoon Mayor Donald Atchison.

“Our government is pleased to see the opening of the Circle Drive South Bridge project, an important part of the Asia-Pacific Gateway,” Fast said.  “By directly supporting trade flows inter-provincially and internationally, this project will ultimately lead to the creation of new jobs, stronger economic growth and greater long-term prosperity in every region of our country.”

“The Circle Drive South Bridge project is symbolic of this province’s enthusiastic embrace of economic growth,” McMorris said.  “The provincial government’s $98 million investment will ensure that moving forward Saskatoon’s shippers and motorists will have the advantage of one of the safest and most efficient roadways our province has to offer.”

“This history making project sets a new standard for innovative and creative ways to finance and build infrastructure projects in Saskatoon,” Atchison said.  “More importantly, this bridge will connect neighbourhoods in a way city leaders envisioned decades ago.  We are also fulfilling a goal of our Strategic Plan- to provide better ways to move around Saskatoon and improve the quality of life for everyone in our community.”

Construction began in 2010 on the Circle Drive South Project, which is the largest single project in the City’s history at an estimated cost of $300 million.  It is cost shared between the Federal Government ($96 million), the Provincial Government ($98.5 million), the City of Saskatoon ($100 million) and the Rural Municipality of Corman Park ($200,000).

 
The Circle Drive South Project involves:

  • a new six-lane south bridge;
  • five new interchanges (Idylwyld Drive, Lorne Avenue, Valley Road, 11th Street, and Preston Avenue South);
  • 10 kilometres of freeway/expressway from Clarence Avenue to Clancy Drive;
  • access requirements of surrounding lands;
  • three railway grade separations;
  • sound attenuation walls;
  • relocation of utilities; and,
  • pedestrian and cyclist pathways.

Major benefits include the shorter commuting distances for traffic, and a 35% reduction in traffic using the Senator Sid Buckwold Bridge at afternoon rush hour.

In March 2010, City Council awarded the design/build contract to Graham Flatiron Joint Venture.  Site preparation and construction began in spring 2010.   The Preston Avenue South interchange will open in September 2013.

The Circle Drive Roadway will officially open to traffic at 8:00 p.m. this evening.

-30-

For more information, contact:

Christina Kasper
Transport Canada
Ottawa
Phone: 613-990-6418

Kirsten Leatherdale
Ministry of Highways and Infrastructure
Regina
Phone: 306-787-8484

Richard Brown
City of Saskatoon
Saskatoon
Phone: 306 975-3202 

 

We need your feedback to improve saskatchewan.ca. Help us improve