Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

WIDENING AND REPAVING ON HIGHWAY 13 NEARLY COMPLETE

Released on September 13, 2012

Motorists will have a smoother, wider section of highway to drive and shippers will be able to haul heavier weights, as construction nears completion on Highway 13 from the Viceroy Access to the Junction of Highway 36.

The work being done at this location will upgrade just over 20 kilometres (km) from a secondary weight highway to a structural pavement capable of carrying primary weight, the highest legal weight shippers can carry on our provincial highway network.

"This is very important to shippers because hauling heavier loads results in a 15 to 50 per cent increase in load capacity, saving haulers money when it comes to inputs," Wood River MLA Yogi Huyghebaert said on behalf of Highways and Infrastructure Minister Don McMorris. "The more of these upgrades we make, the more competitive and attractive Saskatchewan's economic climate will become as we move forward."

This project was launched the week of May 14 and should be complete by the week of September 24. Close to 20 km of the highway was widened and paved from the Viceroy Access to 2 km east of the junction of Highway 36 at a cost of $7.6 million. At times traffic has been reduced to one lane through the construction zone.

Completing this project closes a gap in the primary weight corridor on Highway 13 from Highway 4 to the Manitoba border. This corridor is now capable of carrying primary weight for nine months of the year from the junction with Highway 4 to Weyburn (with the exception of the spring road ban season when highways are susceptible to damage), and for 12 months of the year from Weyburn to the Manitoba border.

In the 2012-13 construction season, $70.5 million has been budgeted for 150 km of rural highway upgrades, as well as commuter and tourism routes.

Motorists are reminded to slow to 60 km/hr past highway construction workers and equipment in the Orange Zone.

-30-

For more information, contact:

Kirsten Leatherdale
Highways and Infrastructure
Regina
Phone: 306-787-8484
Email: kirsten.leatherdale@gov.sk.ca
Cell: 306-536-9692

We need your feedback to improve saskatchewan.ca. Help us improve