Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

CONSTRUCTION WORK UNDERWAY AT PINKIE ROAD AND HIGHWAY 1

Released on June 6, 2012

New Overpass will Increase Traffic Safety

Construction has resumed on the new $43 million overpass at the junction of Highway 1 and Pinkie Road.

"With the commercial and residential development in Regina's southwest quadrant, we are seeing increases in traffic," Highways and Infrastructure Minister Don McMorris said. "Our government is committed to providing the people of Saskatchewan and the Regina region with the infrastructure that will support our growing province, economy and communities."

The new overpass will allow for continued development at the Global Transportation Hub and provide for safer, more efficient traffic flow on Regina's west side.

New construction is beginning on the bridge and grading work, which began in 2011, will continue on the abutments, connecting ramps and roadways. The overpass is expected to be open in late fall, 2013.

The grading and road work for the overpass has been contracted to W.F. Botkin Construction Ltd., while construction of the bridge structure has been contracted to Westridge Construction Ltd. More than 140,000 kg of reinforcing steel will be used in the bridge. Laid end to end, that is almost like driving to Moose Jaw from Regina or 58 kms.

The Ministry of Highways and Infrastructure reminds motorists that significant safety measures are in place temporarily near the construction zone. Traffic signals have been installed at the intersection of Highway 1 and the West Regina Bypass. The speed limit on Highway 1 has also been reduced from 110 km/h to 60 km/h from a distance 525 metres east and west of this intersection.

-30-

For more information, contact:

Doug Wakabayashi
Highways and Infrastructure
Regina
Phone: 306-787-4804

We need your feedback to improve saskatchewan.ca. Help us improve