Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

CONSTRUCTION BEGINS ON NEW ST. LOUIS BRIDGE

Released on January 21, 2011

Trucks hauling approximately 220,000 tonnes worth of material to the new St. Louis Bridge site will begin rolling today as construction gets underway on the south bridge approach off Highway 2.

"Motorists should be aware that there will be a significant increase in truck traffic on Highway 2 south of Prince Albert," Highways and Infrastructure Minister Jim Reiter said. "Upwards of 50 trucks will be moving continually on Highway 2 from west of Wakaw to the new bridge site east of St. Louis, over the next five weeks."

The new bridge will be built 1.6 km east of the existing St. Louis Bridge, as this location has the best foundation conditions, the best alignment for proper sight lines, least impact on agricultural land as it follows an existing north-south road allowance and is the most economical route. This location was chosen in 2001 following community consultation.

The project also includes new connecting roads from the new bridge to Highway 2 that will be constructed east of the existing highways. The road south of the bridge will continue for a distance of approximately 6 km connecting up with Highway 2 immediately south of Hoey. The road north of the bridge will connect to the existing highway about 500 m from the new bridge.

"We're excited to get started on a project that local motorists and shippers have been waiting for a long time," Reiter said. "The province has made a $30 million investment to replace this deteriorating bridge, which is important not only for safety, but also to support the regional economy."

Construction of the north bridge approach is expected to begin in spring 2011. Work will begin on the supporting roads, bridge abutments and piers in the summer of 2011. The bulk of the steel superstructure and bridge deck will be built in 2012.

The new bridge and supporting roads are slated for a late fall 2012 opening, pending favourable weather and contractor progress.

-30-

For more information, contact:

Kirsten Leatherdale
Highways and Infrastructure
Regina
Phone: 306-787-8484
Cell: 306-536-9692

We need your feedback to improve saskatchewan.ca. Help us improve